Moglix Enables “First-Time Right” Fabrication of 117 MT of Pulley Frame and Drive Base Frame for a Mining Project

banner Image

Our Client

The enterprise is a diversified EPC conglomerate with integrated capabilities that span across the “design to delivery” spectrum and is India's largest construction company. The EPC enterprise emerged as the L1 bidder for building the bulk material transportation system for a greenfield coal mining project in Dudhichua, Madhya Pradesh. Moglix intervened as a supply chain solution provider for multiple fabrication requirements such as forging, welding, grinding, blasting, painting, and onsite installation for 117 MT.

Business Challenges

  • Fabrication of a pulley frame
  • Fabrication of drive base frame
  • Trial assembly of fabricated structures
  • Dismantling of fabricated structure
  • Onsite installation of the structures

117 MT of Pulley Frame and Drive Base Frame Fabricated

Solution

Explore how Moglix is enabling 100% GFC fabrication for a mining project in Madhya Pradesh