Moglix Manufactures SCB Module Mounting Structures for 20 MW Solar Power Plant on EPC Basis

banner Image

Our Client

The EPC project developer is a part of India’s leading salt-to-sky conglomerate and was tasked with commissioning the solar power plant of 20 MW installed capacity within the factory premises of the project owner.

Business Challenges

  • 7 weeks permissible TAT
  • Volatility of costs of iron & steel
  • Purchase of raw materials
  • ZED quality fabrication

2 Module Mounting Structures Fabricated

Solution

Explore how Moglix is enabling the commissioning of solar energy plant for the EPC arm of a leading conglomerate